Skip to content

Category: 2018

Antalya Mixed Use

Mesa Antalya

Mixed Use

Project Location

Antalya, Turkey

Project Year

2018

Client

Mesa Mesken

Total Construction Area

108.994,18 m2

Project Category

Mixed Use

Project Status

Competition

Since creating sustainable and humane living spaces is the main starting point of the project, it was aimed to find the correct site-mass settlement scheme with various environmental analysis methods. Different mass alternatives were evaluated in terms of energy consumption, wind, sun and landscape orientation. The orientation of the blocks, taking into account the wind flow, shadow maximization, ideal landscape orientation, and floor decrements were made. It was aimed to transfer the existing natural texture to residential living areas by preserving the existing trees and increasing the green areas in floor gardens and terrace floors.

Oman Modular Master Plan

Oman Modular

Master Plan

Project Location

Muscat, Oman

Project Year

2018

Client

Private

Total Construction Area

296.700 m2

Project Category

Master Plan

Project Status

Completed

The masterplan is designed in a grid manner that allows to shrink or enlarge according to capacity or area needs. This detailed design alternative contains 9 housing modeules and 1 service module which includes community services. Greenery is used as strips between modules and at module centers responsibly. Every module has its own centered parks for recreation and sport purposes with open gyms and playgrounds. Central park that located on the middle of the masterplan covers all sports activities and need of green space for locals. Main circulation is handled by boulevards and alleyways placed in an hierarchical order. 

Diyarbakır Walled City

DIYARBAKIR WALLED CITY

Urban Renaissance

Project Location

Diyarbakır, Turkey

Project Year

2018

Client

Ministry of Environment and Urbanism

Total Construction Area

95.000.000 m2

Project Category

Urban Renaissance

Project Status

Under Construction

Project boundaries, the area called the 5th District, is carrying out survey, restitution and reconstruction studies with an architectural team of about 100 people. Information and documents related to the region were collected from the institutions in 3 stages. Later, many analyzes were carried out, ranging from field point cloud studies, hand sketches, photographs and drone shootings, to material analyzes, which then became the basis for the work of the surveyor.

Çekmeköy Master Plan

Çekmeköy Master Plan

Master Plan

Project Location

Istanbul, Turkey

Project Year

2018

Client

DAP Yapı

Total Construction Area

206.368 m2

Project Category

Master Plan

Project Status

Under Construction

The project area is located on the border of nothern forests in Istanbul Cekmekoy Tasdelen Neighborhood. In this area, which is reserved for mixed use in the case of zoning, residential and commercial, health, education, religious, social and cultural facility and theme park are planned.

Neva Cadde

NEVA CADDE

Residential - Low Rise

Project Location

Kayseri, Turkey

Project Year

2018

Client

INOTO R.E.D.

Total Construction Area

1.589 m2

Project Category

Residential - Low Rise

Project Status

Under Construction

Includes the construction of a villa site in two project areas in İnciroğlu Tea Vineyards in Melikgazi District of Kayseri. One of the projects, the Villa “Street” project, is located on a parcel on the road to Alidağ. Villa “Nature” is located a few hundred meters from the other project site and is located on the skirts of Alidağ. Both of the projects are luxurious and modern designs made from high quality materials. Each building has its own garden and garage. Functionality and naturalness are the most important part of the project, which is dealt with in an approach that facilitates the development of neighborhood relations.

Öz Er-Ka Florya Villa

OZ ER-KA FLORYA

Residential - Low Rise

Project Location

Istanbul, Turkey

Project Year

2018

Client

Oz Er-Ka Construction

Total Construction Area

195.000 m2

Project Category

Residential - Low Rise

Project Status

Concept

The project area is located in the Florya District, one of the greenest areas of Istanbul, in a place where A+ socio-economic class lives. No high-rise building has been seen during the region’s history because of Atatürk Airport. In this respect, a living space consisting of 5-6 storey blocks was designed in the project area and contrary to the projects in the vicinity, a non-gated design was applied.

Currently the project area is sports facilities of Galatasaray Football Team. For this reason, in the project designed, using the landscape materials that reminds of this history was important.

King Faisal Villa

KING FAISAL VILLA

Residential - Low Rise

Project Location

Istanbul, Turkey

Project Year

2018

Client

Private

Total Construction Area

1.590 m2

Project Category‬

Residential - Low Rise

Project Status

Under Construction

Located in Sarıyer, Istanbul, King Faisal Grove, the project includes the renovation of the existing villa. These renovations are mostly based on more efficient solutions that improve the use of the structure.

The interior was redesigned with the use of seperator panels while preserving the main structure and the facade design was renewed at the material level. While the garden layout was updated, the basement floor was designed within these changes.

Arnavutköy Master Plan

Arnavutköy Master Plan

Master Plan

Project Location

Istanbul, Turkey

Project Year

2018

Client

The Emlak Konut REIC

Total Construction Area

1.777.260 m2

Project Category

Master Plan

Project Status

Completed

The project area is located in Arnavutköy District of Istanbul. The size of the land is 2.8 million square meters. The project area is located on a developing area through the “Canal Istanbul” route which is one of the Istanbul’s mega projects.

In the project area, which is located in the northern forests of Istanbul, low-rise buildings are designed and the forested areas are completely protected. A wide range of social activities and hobby gardens are planned between the canal and settlements. The project area, which attracts attention with its proximity to the İstanbul Airport, is designed with a city fiction where the employees will live in.

Birlik Automotive and Industrial Zone

BIRLIK AUTOMOTIVE AND INDUSTRIAL ZONE

Industrial

Project Location

Istanbul, Turkey

Project Year

2018

Client

Birlik Mensucat

Total Construction Area

102.700 m2

Project Category

Industrial

Project Status

Concept

Prior to the textile factory in the area, an ecosystem was planned for the motor vehicles, which could easily be purchased, repaired and maintained.

While the linear masses have a commercial function on the ground, repair and maintenance units are planned on the upper floors and the circulation between the car and these floors has been designed carefully. In the basement floors, there are warehouses and other repair shops.

Anchor units located in the middle are designed with the aim of hosting prestigious brands and integrated with the green pedestrian circulation axis created in the project.

Kayseri Suriçi Project

KAYSERI WALLED CITY RENOVATION PROJECT

Master Plan

Project Location

Kayseri, Turkey

Project Year

2018

Client

Municipality

Total Construction Area

29.325 m2

Project Category

Master Plan

Kayseri Suriçi Project is a project designed to restore the historical identity of the region, which has lost its historical fabric in time and has lost its connection with the city due to the dynamics of it.

According to the function and characteristics of the project divided into three regions, the first region, creates a connection between the Great Mosque and Kurşunlu Mosque, the second region, contains a museum square revolves around the library,and the third district Tavukçular neighborhood is designed as a bridge to connect these historical regions with a commercial function.

Within the scope of the project area, historical buildings including the historic city walls and the closed bazaar, madrasah, mosque, bazaar, old high school, bath and complex are seen as historical important structures, which vitalize the area.

The present situation of the monumental historical buildings in the project area was analyzed by visiting the region. Most structures have been found to be unusable, in need of maintenance and renewal.

Istanbul Head Office

Ayazaga Dist. Azerbaycan St. Vadistanbul 2B Office, No: 3K, Floor: 6, 34485 Sariyer, Istanbul, Turkey