
Few of the train rails that were lifted to access the project area were retained. In addition, a vehicle road was designed instead. A pedestrian path was designed to access the project area and commercial units were accessed. A bridge that connects directly to the project area from the designed train station was designed and aimed to be a landmark. In this project, which provides residential, commercial and social reinforcement areas, noise and sound control is a very important point.

